Poultry Factory Purchased Phantom Equipment Worth €2.2mln
It was never installed.
An inspection found out that a Zhlobin-based poultry factory in Homiel Region purchased the equipment worth €2.2mln which, however was never installed.
The factory received a fx loan in 2010 which was spent on the equipment modernization. However, the newly purchased equipment shipped to the factory in 2011 was not installed as the corresponding shop had not been built as the land property is still not clarified.
The auditors have already appealed to a superior organization to solve the issue.