Minskstroy showed what the new infectious disease hospital looks like
Construction of a new building for the adult infectious disease hospital continues in Navinki. The "Minskstroy" concern showed what the building currently looks like.

Over three hundred people are already involved in the construction, and their number is gradually increasing.
Workers on site include erectors from the construction management - 199, finishers from CU-211, installers of plumbing systems, electricians, and elevator technicians.

In ward buildings 2A and 2B, where heat is already available, plasterboard partitions are being erected, rough electrical wiring is being laid, low-current systems are being installed, floor screeds and plumbing works are being carried out, and medical gas networks are being connected. Rough finishing works are also unfolding in buildings 2B and 2G.

Simultaneously, 12 elevators are being installed — three in each ward building.
The main building is already clearly taking shape from LSTC (light steel thin-walled structures) and monolithic inserts. Two tower cranes and special equipment are in operation.
The modern complex will consist of a main building and four ward buildings, as well as a small building for treating particularly dangerous infections. The facility will be supplemented with utility buildings and parking. Light steel thin-walled structures are used in the construction of the institution.

Now reading
A Big Conversation with Lesia Rudnik about sexism, her wrestler husband, the salary of a Doctor of Science in Sweden, the opposition, and the European Union's mistake
Comments
Планавалі сучасны корпус на 300–400 ложкаў, а з-за недахопу сродкаў і змены прыярытэтаў будаўніцтва расцягнулі і спрасцілі. Гэта дзяржаўны даўгабуд, які перыядычна з’яўляецца ў прапагандыскiх навінах як «будаўніцтва працягваецца»